Our evaluation of BC’s e-bike rebates involved two phases: Phase 1 evaluated rebates distributed in 2023, and Phase 2 evaluated rebates distributed from a second round of funding in 2025. Click the following links for the results of each study.
Phase 1 Study Report (2025)
Phase 2 Study Report (2026 – released September 22)
